The House

I'm still awaiting the photos from my daughter concerning the renovations going on to the house ... sigh! Hopefully, soon....

Friday, my picky and demanding contractor (AKA "the-son-in-law" had us meet at the house to make some final decisions about electrical placement, etc. I think I've mentioned that there were various 1" level differences throughout the house. That's simply a result of the house being sliced/diced over the years. While we were there the workers were trying to remove what we THOUGHT were stick-on tiles in the sun-rooms....they were not. whoever put the sun-rooms in had placed the tiles one the WET cement and pushed them in - making it literally impossible to take up. I'm not sure what they thinking about that was, or even if they were thinking.

Regarding tile - On Tuesday my daughter/son-in-law and I went and picked out tile for the house. One of the major changes involves putting the same color tile throughout the entire house. we had a plan A and a plan B as far as color was concerned ... no problem. On Wednesday, the tile man started calling the various stores to place the order. In the size of tiles needed (18" x 18" - 45.732 x 45.72 centimeters)it was discovered that in spite of being a highlighted for sale tile, not one single store here had enough tile. Some had 10 pieces (NOT boxes) another had 100 pieces, etc. My beloved son-in-law was ready to pull the hair out of his shaved head. Then one of the stores told him it could be ordered in delivered in - oh - three to four weeks. At this point my beloved son-in-law was starting to show signs of complete melt-down.

His tile guy looked at the back of the sample piece and literally called the plant where the tile was manufactured. He discovered that 1) the tile was manufactured in a plant about 7 hours from here and 2) if they were there the next morning they would load up ALL the tiles that had been chosen (tiles,boarders, edging, etc.) as well as all the grout and other things necessary to install them.

Two of my son-in-law's workers put his trailer on the back of their truck and drove - basically all night - and picked up the tiles and drove back to get them there to have the house tile finished this weekend.

However, I was informed Friday that I have been been place on "house restriction" - meaning that I am not allowed to see the house until Monday....

I threatened today to get into "drag" and visit the house incognito. My son-in-law texts back that when he finally stopped laughing hysterically - it wouldn't work. So, I promised that I would behave and NOT go to the house this weekend. And frankly with the temperatures and heat index being in the triple digits all weekend and much of next week ... I don't plan on going too many places at all...

More to follow - hopefully with more pictures!!!!!!

Monday, August 22, 2011

The House ~ continued

After reading today of Mitt Romney's decision to bulldoze his "small" house and build an 11,000 square foot addition, I'm almost afraid to write about mine. It certainly isn't anything like his ~ but after all the years I've been paying money to apartment owners, it probably will feel like it!!!

As I've mentioned my Son-in-Law is doing all the destruction/reconstuction on the house. On Monday, I thought I would surprise him and his workers by showing up - unannounced. My good friend BW drove me to the house. I don't drive, but that's for another set of posts, dear friends. I was sure I saw his truck in the driveway along with all the other vehicles. We entered the front door and as I was pushing back the plastic keeping dust and such contained - I yelled out: "My moving van is outside, where do I put all my stuff?"

As we rounded the corner, I realized that 1) he was NOT there and 2) these folks had absolutely NO idea who in the heck I was. SIGH! Fortunately, I introduced myself quickly, and the ice thawed even more quickly. I was taken on a tour and shown what was happening, and what was planned. If it is possible, I became even more excited!!! S was the fellow in charge and he explained as much as possible. He had a couple of questions for me and we made our way over piles and piles of lumber, etc. It was obvious, the dumpster had not arrived yet....very obvious.

I felt as if I'd caused enough chaos for the day, and we left more quietly than we arrived...

Wednesday, my daughter and I met J at the house for further discussions about plans and such. Unfortunately, my son-in-law IS a contractor and just as in other professions, they speak their own language. Fortunately, S was there to translate - both directions I might add.

Friday, we had to meet there again and this time, the dumpster had arrived and the place looked less as if something or someone had exploded in there and more like a construction site. There were some issues that needed to have decisions - for instance, my idea for the master bathroom had hit the reality of the space. Not a big problem, but that took some time to talk out.

This is a picture of the bathroom I'm talking about. I decided it was the winner of the "world's worst bathroom" ... to give a point of reference, it will be almost three times the size it is in the picture.



The toilet was taped closed for the estate sale - for very good reasons, and I'll leave it at that!!

More later - and hopefully, I'll have some pictures of the destruction by then!!!